Case Study: Delivering an Integrated Retrofit Solution Designed for Scale

overview

Overview

Our system is an innovative, integrated retrofit solution that transforms outdated homes to near new-build standards, delivering properties capable of achieving EPC A.

Designed for landlords and local authorities, our system brings together fabric, ventilation, energy, and future-readiness measures into a single, coordinated delivery model – creating warmer, healthier, and more energy-efficient homes at scale.

solution

The Challenge

Scaling domestic retrofit presents major barriers, including high costs, fragmented delivery, resident disruption, and uncertainty around future low-carbon technologies.

Our system addresses these challenges through a designed package of works and a phased retrofit approach, ensuring immediate performance improvements while future-proofing homes for technologies such as air source heat pumps.

The Solution

Following a detailed retrofit assessment by Bow Tie Construction, a decision was taken to retain the existing boiler while installing the infrastructure required for a future heat pump upgrade.

This approach enables:

  • Cost-effective delivery today
  • Reduced risk around warranties and maintenance
  • Seamless future transition to low-carbon heating
  • Phased retrofit, with readiness from day one, is the key to delivering retrofit at scale.
ultrapanel-retrofit-solutions

Retrofit Measures Delivered

  • UltraPanel structural panel system
  • Mechanical Extract Ventilation (MEV) to kitchens, bathrooms, and under-floor spaces
  • Window repairs (where required) and moisture-sensitive trickle vents.
  • Airtight loft hatch and loft improvements • Solar PV and battery storage
  • Whole-house draught proofing
  • Heating system upgrade readiness for future air source heat pump installation
delivery-outcomes

Delivery & Outcomes

  • Works completed in just 4 weeks
  • Minimal resident disruption
  • Significant improvement in energy efficiency and comfort
  • EPC A capability achieved.
  • Replicable model for large-scale retrofit programmes

The demonstrator launched successfully on 9 December 2025, with lessons learned captured to support wider rollout across housing portfolios.